Go to main content

P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; April 4, 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History