P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; April 4, 1978; USBR photo by D.J. Kline
Title
Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor
Original photograph: 13 x 10 cm, black & white photo, caption under photo reads "P12-201-4559NA Klamath Project, OR-CA Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; April 4, 1978; USBR photo by D.J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4559NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation