Go to main content

P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History