Go to main content

CN-12-201-291NA Klamath Project - Oregon-California. Experimental Line in Unit 71. View of fiberglass membrane covered tubing being fed into hopper unit behind trenching machine. Installation methods were the same as used for the placement of non-sheathed tubing (no cinders were used). This pipe was placed as a test section in the north end of Unit #71; February 1973; Bureau of Reclamation photo by D. W. Stein

Metric
From
To
Interval
Export
Download Full History