Go to main content

KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History