Go to main content

KP-2402-R2 - CLEAR LAKE - Klamath Project. Soil sampling procedure. Veimeir soil sampling tube, about 1 1/8" in diameter being driven into soil on bottom of Clear Lake. The tube is inside 3" pipe which has been driven about 1 ft. into bottom. Dave Bunger watching John McKeag drive pipe; October 16, 1957; Photo by K. J. Greene

Metric
From
To
Interval
Export
Download Full History