P12-201-4290 NA Klamath Project OR-CA. 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete from transit mixer to pier (excavation site). Center Canal flume in background; January 14, 1977; USBR photo by D. J. Kline
Original photograph: 13 x 10 cm, black & white photo, caption under photo reads “P12-201-4290 NA Klamath Project OR-CA KSD Enlargement, Phase II - Specs. 200C-954 - RHC Constr., Inc., Contractor 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete fromnsit mixer to pier (excavation site). Center Canal flume in background. Jan. 14, 1977 USBR photo by D. J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4290 NA Klamath Project OR-CA, Black Binders, Bureau of Reclamation