Go to main content

KP-2637-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral, Specifications DC-5483. Front view of Briscoe ditcher excavating prism of R-2 lateral, Sta. 2+00 after lining has been placed solid across the lateral. Excavated material used to complete lateral banks; November 16, 1961; Photo by J.A. Renning

Metric
From
To
Interval
Export
Download Full History