Go to main content

KP-2199-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. End of 30-inch over-excavated section for compacted earth lining showing also, undisturbed ditch; April 13, 1953; Bureau of Reclamation Photo by C. O. Wamstad

Metric
From
To
Interval
Export
Download Full History