KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the loop. Again it was pulled to the top, vibrating the concrete into place; July 18, 1947; Photo by H. W. Sexton