P12-201-4357 NA Klamath Project, OR-CA. At Plant FF site, conduit trenches excavated to a depth of 2 feet, with 1" rigid and 3" rigid electric conduit in place for metering and 2.5kv runs. Notice northeast corner of PP&L transformerin (sic) rt. hand lower corner of photo; March 19, 1977; USBR photo by D. J. Kline