Go to main content

P12-201-4388 NA Klamath Project, OR-CA. Inlet to Plant EE after nearly 2 inches of rain in a 5-hour period. Power to dewater pumps was lost due to lightning knocking out transformer. Power was out for about 12 hours. This are (sic) was dug out at a later date and a gravel base material imported to achieve 95% density requirements for backfill; June 6, 1977; USBR photo by D. J. Kline

Metric
From
To
Interval
Export
Download Full History