Go to main content

No. 1 - Klamath Project. Link River Dam. Photo taken easterly of the Dam and new spillway and stilling section as constructed. Spill of 2800 cfs at time of photo. Elevation at time of photo, 4142.41. West Side Canal foreground, 268 cfs; February 10, 1953 at 2 p.m; Photo by The California-Oregon Power Co.- Gib Fleet

Metric
From
To
Interval
Export
Download Full History