Go to main content

CN-12-201-307NA Klamath Project - Oregon-California. High pressure pump (200 psi, 5 gpm) used in cleaning up­stream face of the dam. Pressure used was 800 psi; November 1973; Bureau of Reclamation photo by J. A. Renning

Metric
From
To
Interval
Export
Download Full History