CN-12-200-22A. Gerber Watershed - Klamath Project, Oregon. Earthfill dam and reservoir constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. Earth spillway is located at left end of dam. Maximum depth of water to lip (?) of spillway is about 6.5 feet. The storage capacity approximates 0.5 acre-foot; September 6, 1968; Bureau of Reclamation photo by T.J. Rosten