KP-2160-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking downstream from Station 235+50 on left bank. Right-of-way being prepared to hold wet excavation material from channel. Dike extreme left at edge of right-of-way and one in left center will form inside toe of embankment. McKinnon Construction Company, contractor, Specs. DC-3682; July 2, 1952; Photo by C. O. Wamstad