Go to main content

P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January 17, 1977; USBR photo by D. J. Kline

Metric
From
To
Interval
Export
Download Full History