Go to main content

KP-2185-R2 - Klamath Project. Link River Dam. View of river gate section stilling basin which is under construction by The California-Oregon Power Company. Picture was taken from southeast side of excavation for stilling basin, looking upstream to river gate section; October 28, 1952; Bureau of Reclamation Photo by A. M. Bergloff

Metric
From
To
Interval
Export
Download Full History