Go to main content

CN-12-200-23A Gerber Watershed - Klamath Project, Oregon. Earthfill dam and spillway constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. This is another view of the reservoir and dam shown in Photograph No.CN-12-200-22A; September 6, 1968; Bureau of Reclamation photo by T.J. Rosten

Metric
From
To
Interval
Export
Download Full History