Go to main content

KP-2461-R2 - Klamath Project--TULE LAKE DRAINAGE EXPERIMENT, LOT 23, LEASE AREA B-1. Looking east on Line "B" of experimental tile drain. Contractor laying 4-inch Bituminous perforated pipe (Orangeburg) with 16-inch L.O.B. tile guard. Fibreglas over top of pipe; April 30, 1958; Photo by L. McAnulty

Metric
From
To
Interval
Export
Download Full History