Go to main content

KP-5 - Klamath Project. Looking East at C-Canal Flume Crossing, (Station 78) dismantled preparatory to constructing new piers, State Highway bridge in background, 1-B drain on right of Channel. Section between Flume and highway has not yet been enlarged; October 20, 1949; Photo by Andy Bergloff

Metric
From
To
Interval
Export
Download Full History