Go to main content

P12-201-4467 NA Klamath Project, OR-CA. Ady Canal--west end of excavation for siphon inlet transition. Depth is approx. 2.0 ft below subgrade. Note: Free water being pumped out by small 3/" electric pump. Approx. 30 gal. per hour; October 1977; USBR photo by D.W. Stein

Metric
From
To
Interval
Export
Download Full History