P12-201-4385 NA Klamath Project, OR-CA. Center Canal Flume--RHC Construction applied 3 of these metal retaining clamps and also 4x14" kick braces to both sides of flume wall; May 24, 1977; USBR photo by D. J. Kline
Title
Kl. Str. Drain Enlargement, Phase II, Specs. 200C-954- RHC Constr., Inc., Contractor
Original photograph: 13 x 10 cm, black & white photo, caption under photo reads "P12-201-4385 NA Klamath Project, OR-CA Kl. Str. Drain Enlargement, Phase II, Specs. 200C-954- RHC Constr., Inc., Contractor Center Canal Flume--RHC Construction applied 3 of these metal retaining clamps and also 4x14" kick braces to both sides of flume wall. May 24, 1977 USBR photo by D. J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4385 NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation