Go to main content

P12-201-4361 NA Klamath Project, OR-CA. Pumping Plant FF slab concrete placement. View shows placing concrete for first lift. (Slab was placed in two lifts). Vibration was by means of two air-powered vibrators (2-inch). View looking east toward plant inlet; May 5, 1977; USBR photo by D. J. Kline

Metric
From
To
Interval
Export
Download Full History