Go to main content

P-12-200-4156NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, on western side of Straits Drain. This is adjacent to Clyde Horsley's Property and is in lieu of an open toe drain. Hoes Trencher excavating for 20 ft. section of 8" CMP to be installed as the outlet section; May 1976; USBR photo by D. W. Stein

Metric
From
To
Interval
Export
Download Full History