KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 to Station 23+00. Scraper easily spreads material in 3-inch thickness; November 3, 1960; Photo by John A. Renning