P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in 8± c.y. loads (Approx. 20 min. one way.) Concrete being placed with 35 ton Grove Crane, using 1 cubic yard bucket. Vibration by means of (2) electric vibrators (14,000 cpm). October 1977; USBR photo by D.W. Stein