P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. Piling driven to 17-22' depth, 53,000 lbs. to over 60,000 lbs. bearing; January 12, 1977; USBR photo by D. J. Kline