Go to main content

P12-201-4460 NA Klamath Project, OR-CA. View looking east. Pumping Plant EE--outlet transition material HD-5 Cat and laborer are standing on is imported 3/" minus with fines. This material is 1' deep. This was ordered by contracting officer due to poor subsoil native to area and high water table; October 1977; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History