Go to main content

P12-201-4426 NA Klamath Project, OR-CA. Ady Canal--To get carrier pipe through the tunnel liner ice (crushed) was spread over sand bedding in tunnel liner plate. A car hood was used as a sled on leading bottom edge to set in place and carrier pipe was pulled through from west to east; September 9, 1977; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History