Go to main content

KP-1093-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Considerable water was encountered and two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the immediate water table drawn down, two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the immediate water table drawn down two 6" pumps were capable of taking care of the inflow. Material consists of diatomite or a diatomaceous earth with some streaks of sand or heavier material; January 29, 1945; Photo by R. S. Hopkins

Metric
From
To
Interval
Export
Download Full History