Go to main content

P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History