The Federal action addressed is retrofitting a heating and hot water system in a hospital at Marlin, Texas, with a geothermal preheat system. The project will be located within the existing hospital boiler room. One supply well will be drilled in an existing adjacent parking lot. Fluid disposal from operation will depend on fluid properties and may be by surface disposal to existing street drains, by surface disposal to a new drainage system, or by injection into a new injection well, depending on total dissolved solids (TDS) content. Environmental impacts of construction are expected to be small because of the existing structures and paved areas. Construction run-off and geothermal flow-test fluid will pass through a small pond in the city park, lowering its water quality, at least temporarily. Construction noise is not expected to be out of character with existing noises around the hospital. Project operation is not expected to produce significant impacts because of the decision point to determine fluid composition prior to designating a disposal method. Injection would be into a saline aquifer, and surface discharge would not appreciably lower water quality in the Brazos River; DOE/EA-0067