Go to main content

The Hijiori hot dry rock test site is located in Japan, on the southern edge of the Two-kilometer diameter Hijiori caldera, which was formed about 10,000 years ago. This document summarizes the Geothermal Powerplant project at this site.

Metric
From
To
Interval
Export
Download Full History