Go to main content

The Magma Gulf-Technadril/Department of Energy Amoco Fee # 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982

Metric
From
To
Interval
Export
Download Full History