Originally published as: Environmental assessment, replacement of the comfort station facilities at Cleetwood Cove Trail, Crater Lake National Park; ([Denver, Colo. U.S. Dept. of the Interior, National Park Service, Denver Service Center]); 26 p.; 28 cm.
Date Original
[1983]
Date Digitized
2008-08-19
Date Available
2008-11-17
Original Publisher
U.S. Dept. of the Interior, National Park Service, Denver Service Center
CONTENTS
PURPOSE OF AND NEED FOR ACTION 1
AFFECTED ENVIRONMENT A
Existing Conditions 4
Park Location and Access 4
Visitor Facilities 4
Natural Environment A
Geology 4
Topography/So ils 5
Climate/Air Quality 5
Hydrology 6
Vegetation 10
Wildlife/Fisheries 10
Cultural Resources 11
Socioeconomic Environment 11
ALTERNATIVES 13
Alternative A: No Action 13
Alternative B: On-Site Reconstruction 13
Alternative C: Relocation Near the Boat Dock Area 13
Alternative D: Relocation on the Point (Preferred) 16
ENVIRONMENTAL CONSEQUENCES 18
SUMMARY OF IMPACTS 21
REFERENCES CITED 23
PREPARERS AND CONSULTANTS 26
Rights
Digital image copyright 2008. Oregon Institute of Technology. All rights reserved. http://digitallib.oit.edu/cdm/copyright/collection/craterlake