Go to main content

Construction of buildings on New Campus. The photograph shows construction of the Physical Education Building. The interior shot shows metal piping on the ceiling and supporting metal rods. There is a wall of floor-to-ceiling windows on the right

Metric
From
To
Interval
Export
Download Full History