This report is an Oregon Institute of Technology thesis project completed in partial fulfillment for the Masters of Science in Renewable Energy Engineering degree. The testing and research done for this report, investigate the phenomena of water start up time in the spiral case of hydro units. Water start up time is defined as the time it takes for water to accelerate from zero to rated velocity. From analysis of the literature there shows no published article of water start up time being measured and compared to theoretically calculated values. However a multiplier is used to create a buffer in the estimations of water start up time to use in the engineering and selection of governors for hydro units. The multiplier has also been widely used in computer model simulations which causes a dependence of this multiplier.