Go to main content

Construction of buildings on New Campus. The photograph shows the construction of the interior of the Physical Plant Building: metal rafters under the ceiling, wide metal cases for piping, vertical columns and open cardboard boxes on the floor

Metric
From
To
Interval
Export
Download Full History