P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's auger purchased for this operation was used to drill the holes through the piling; April 4, 1978; USBR photo by D.J. Kline