P12-200-2857NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. Original timber covering the basin floor and concrete in overflow structure were in excellent condition. Two to three inches of ice over downstream area of basin. Left to right: T. J. Spicher, G.W. Fuller, J. L. Andrews, B. H. Carter, and T. E. Morris; February 16, 1966; Bureau of Reclamation photo by Wes W. Nell