P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April 6, 1978; USBR photo by D.J. Kline
Title
Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor
Original photograph: 10 x 13 cm, black & white photo, caption under photo reads "P12-201-4551NA Klamath Project, OR-CA Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; Apr. 6, 1978; USBR photo by D.J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4551NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation