Go to main content

P12-201-4544NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows east side footing with 4 regular piles in front with 2 added piling in rear. One can just see the added pile behind the 1st. This pile slid out of position due to resistance and jetting action. Sheet piling are from original dewatering layout and were removed where necessary for concrete pile cap; March 29, 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History