Go to main content

KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner of raft near gas cans is one of three attached to anchors; October 16, 1957; Photo by K. J. Greene

Metric
From
To
Interval
Export
Download Full History