Go to main content

P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of plastic drainage tubing into the hopper. This short section will be used to pull plastic tubing into hopper for easy placement in trench when trencher moves to next drain line; November 1972; Bureau of Reclamation photo by D. W. Stein

Metric
From
To
Interval
Export
Download Full History