Go to main content

KP-1889 - Klamath Project. Lower cost canal lining. This picture shows the laying of an asphalt strip after each end had been dipped in solvent compound; December 8, 1949; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History