KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture has been completed and the channel is seen between it and the ridge of dirt shown in the center. To the left the dragline is excavating a puddle trench under the east bank section of the lateral for the purpose of breaking up subsurface cracks which extend down as much as three or four feet. The two plowed furrows on the right side of the picture are used on the edge of the cut for the drain. Excavation from the drain will be used to fill the puddle trench and build the east bank of the lateral; January 29, 1945; Photo by R. S. Hopkins