Go to main content

P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These measures were taken to stop undesirable return flows while jetting for the north abutment; April 6, 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History