Go to main content

KP-1550-R2. Klamath Project. The pipe is filled with water under pressure for uniform loading, and loaded at third points with sand for concentrated loading; September 15, 1947; Photo by Dorwin Grise

Metric
From
To
Interval
Export
Download Full History