P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo by D.J. Kline
Title
Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor
Original photograph: 13 x 10 cm, black & white photo, caption under photo reads "P12-201-4566NA Klamath Project, OR-CA Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as show fill 84" RCP prior to testing 84" CMP; Apr. 6, 1978; USBR photo by D.J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4566NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation