Go to main content

KP-1884 - Klamath Project. N-16 Lateral. Lower cost canal lining. Laying of second strip of asphalt membrane with approximately 2-inch overlap. George L. Browning and L. G. Oliensis on far side of channel holding strip in place; December 8, 1949; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History